When do I need a minor variance for a build in Hamilton?

In Hamilton, when a plan cannot meet the zoning by-law, such as an addition too close to a lot line or a garden suite over the height limit. You apply to the Committee of Adjustment for a minor variance, and only after approval for the building permit. In 2026 the fee is $4,135, or $745 for a routine one such as a porch, deck or secondary unit. JDT Construction draws the plan on your lot first, where a problem shows.

How do I know if my plan needs one?

The City checks every permit application against the zoning by-law, which sets out Location of buildings and other structures on a lot, building size, height, lot sizes and parking. Its permit review page then says: If you are unable to comply with the provisions of the Zoning By-law, you may submit an application to the Committee of Adjustment for a minor variance. (City of Hamilton, Building Permit Review and Approval, read November 5, 2026) The common triggers on a house are setbacks, height, lot coverage and parking. Which zoning by-law covers your lot is on the areas page.

What does it cost?

City of Hamilton Committee of Adjustment fees, 2026
ApplicationFee
Minor variance$4,135
Routine minor variance: pools, decks, sheds, accessory buildings, porches, eave projections, legal non-complying situations and secondary dwelling units$745
Variances required after the fact$5,160
Recirculation$340
Zoning compliance review in support of a minor variance$520

Fees from the City's Planning Division Fees 2026 (City of Hamilton, Planning Division Fees 2026, read November 5, 2026). Note the after-the-fact fee: asking first is cheaper than asking forgiveness.

What happens after I apply?

The Committee of Adjustment holds a public hearing and decides. If it approves the variance, the City says you may submit a Building Permit application, subject to the terms established by the Committee of Adjustment (City of Hamilton, Building Permit Review and Approval, read November 5, 2026). So a variance adds a step before the permit, and the drawings have to match what the Committee approved. The Committee is at City Hall, 71 Main Street West, 5th floor, 905-546-2424 extension 4221 (City of Hamilton, Committee of Adjustment, read November 5, 2026).

How does this affect an addition or an ADU?

Most ADU rules are fixed distances and sizes, so a garden suite that misses one by a little is a typical variance; the ADUs page has the distances. On additions, the rear yard and side yard setbacks are the usual issue. JDT Construction Inc. draws the work on your lot before there is a price, which is where a setback problem shows up, before anyone has paid for permit drawings. What the permit costs once the variance is through is in what a building permit costs.

Have a build in mind?

Call to talk it through, or send photos of the house and where the new work goes. JDT replies by phone or email.

Request a quote